Our LPG Cylinder Water Immersion Air Tightness Testing Machine is designed to inspect pressurized steel LPG cylinders for potential air leakage through visible bubbles during water immersion. We combine automatic cylinder feeding, a mechanical lifting system and a water tank to support the inspection process.
Operators rotate submerged cylinders and observe their surfaces for bubbles. We can review your cylinder specifications, testing procedures and inspection capacity to discuss suitable equipment configurations.
| Availability: | |
|---|---|
| Quantity: | |
We design our LPG Cylinder Water Immersion Air Tightness Testing Machine to inspect steel LPG cylinders for potential air leakage through water immersion and visual bubble observation. Our equipment provides a dedicated inspection station for checking cylinder air tightness under the required test conditions.
We combine a water tank, lifting mechanism, automatic cylinder feeding mechanism and electrical control components to support cylinder handling throughout the inspection process.
We automatically feed and lift the cylinders, while operators rotate the submerged cylinders and observe their surfaces for escaping air bubbles. This arrangement combines automated handling with manual visual inspection.
We can review your cylinder specifications, applicable testing procedures and workshop requirements to discuss suitable equipment configurations.
We combine automatic cylinder transfer and mechanical lifting with operator-based leak inspection to complete the water immersion testing process.
We recommend preparing your LPG cylinders according to the applicable inspection procedure.
Before testing, we recommend confirming the required test pressure, holding time and acceptance criteria for the intended cylinder type.
We use our automatic cylinder feeding mechanism to transfer the prepared cylinder into the testing position.
This arrangement reduces the need for manual transfer during the immersion process.
We operate our lifting mechanism to lower the cylinder into the water tank.
We recommend confirming the required immersion position and water level according to your inspection procedure.
We maintain the specified test conditions during the inspection process.
We recommend verifying the required pressure and holding time against your cylinder specifications and approved inspection requirements.
The numerical values are provided in the Technical Specifications section.
During immersion, operators rotate the cylinder and inspect its surface for visible bubbles.
We use this observation method to help identify potential air leakage.
Manual visual inspection remains an essential part of the process; the machine does not automatically detect and classify leaks through a camera system.
After inspection, we raise the cylinder from the water and use the feeding mechanism to transfer it away from the testing position.
We recommend recording and evaluating inspection results according to your quality control procedures before releasing cylinders to subsequent production operations.
We use water immersion testing to reveal potential air leakage through visible bubbles.
Our equipment supports direct visual inspection of pressurized LPG cylinders.
We equip our machine with an automatic feeding mechanism to move cylinders into and out of the testing station.
Our feeding arrangement supports an organized inspection workflow.
We use a lifting mechanism to lower cylinders into the water tank and raise them after inspection.
We can discuss suitable lifting arrangements according to your cylinder dimensions and handling requirements.
We retain manual cylinder rotation and visual bubble inspection as essential parts of the testing process.
We recommend ensuring suitable operator access and visibility when planning your inspection station.
Our equipment requires a compressed-air supply for the relevant operating functions.
We recommend confirming your factory's compressed-air supply conditions before equipment installation.
Our technical specifications include a separate pressure value associated with the air tightness test.
We recommend reviewing your applicable cylinder testing procedure to confirm the required inspection conditions.
Our equipment specifies a pressure maintaining period.
We recommend considering the additional time required for cylinder feeding, immersion, manual observation, lifting and discharge when evaluating overall inspection capacity.
We integrate the water tank, lifting mechanism, feeding system and electrical controls into a dedicated testing arrangement.
Our design focuses on convenient operation and maintenance access.
Main technical parameter | |
Air source pressure | 0.6Mpa |
Air source pressure of pressure test | 2.2Mpa |
Pressure maintaining time | 60s |
Weight | 2.5T |
We provide the following equipment assemblies:
Water Tank: For immersing cylinders during air tightness inspection.
Lifting Mechanism: For lowering and raising cylinders.
Automatic Cylinder Feeding Mechanism: For transferring cylinders through the testing position.
Electrical Control Components: For supporting the machine's handling and lifting operations.
Related Mechanical Assemblies: For completing the inspection station arrangement.
We recommend confirming the applicable cylinder diameter, height, maximum cylinder weight, water tank dimensions, lifting capacity and electrical requirements before finalizing the equipment configuration.
The original parameter name, "Air Source Pressure of Pressure Test," is retained to avoid changing the meaning of the published technical data without confirmation.
We recommend confirming whether this value should be labeled "Air Tightness Test Pressure" in the final product specifications.
At FAR EAST, we provide customized LPG cylinder testing equipment for different cylinder specifications, inspection procedures and production line arrangements.
We can review your project requirements in the following areas.
We evaluate your cylinder diameter, height and weight to discuss suitable water tank dimensions, lifting capacity and feeding arrangements.
We recommend providing your approved inspection procedure so we can review the required test pressure and holding time.
We can discuss suitable testing arrangements according to your cylinder specifications.
We can discuss the immersion arrangement, water tank dimensions and operator access requirements.
We focus on providing a practical inspection position for manual cylinder rotation and bubble observation.
We can evaluate the connections between our automatic cylinder feeding mechanism and your adjacent production stations.
We recommend confirming conveyor interfaces and material handling requirements during technical discussions.
We can help you assess the complete testing cycle, including feeding, lowering, pressure maintaining, observation, lifting and transfer.
We do not treat the pressure-holding period alone as a guaranteed total cycle time.
We recommend defining the applicable testing standard, inspection conditions, acceptance criteria and recording requirements before equipment procurement.
We also provide equipment for other LPG cylinder manufacturing and inspection operations, including:
LPG Cylinder Automatic Hydrostatic Pressure Testing Machines
LPG Cylinder Valve Installation and Removal Machines
LPG Cylinder Valve Seat Welding Machines
LPG Cylinder Shot Blasting Machines
LPG Cylinder Powder Coating and Liquid Painting Production Lines
LPG Cylinder Reconditioning and Refurbishing Equipment
We can discuss suitable equipment combinations for your manufacturing process while keeping hydrostatic strength testing and air tightness testing as separate inspection operations.
We design and manufacture machinery for steel gas cylinder production and testing.
Our equipment range includes dedicated air tightness testing systems and machinery for other inspection and manufacturing stages.
We combine automatic feeding, mechanical lifting and operator-based bubble inspection in our air tightness testing equipment.
We focus on providing a practical arrangement for cylinder handling and visual leakage checks.
We are a national high-tech enterprise specializing in gas cylinder manufacturing equipment.
Our R&D achievements include more than 20 invention patents, 15 granted patents and 2 software copyrights.
We maintain an ISO 9001-certified quality management system and apply quality management procedures during equipment manufacturing.
We can discuss relevant inspection documentation and equipment acceptance requirements during procurement.
We can review your cylinder specifications, inspection procedures, workshop layout and production capacity to discuss suitable water tank, lifting and feeding configurations.
We supply gas cylinder manufacturing equipment to more than 40 countries and regions.
We provide pre-sales consultation and after-sales support, and we can discuss installation guidance, operator training, maintenance and spare parts according to your purchase agreement.
Are you looking for an LPG Cylinder Water Immersion Air Tightness Testing Machine for your cylinder production or inspection facility?
At FAR EAST, we provide water immersion testing equipment with automatic cylinder feeding, mechanical lifting and visual bubble inspection to support your LPG cylinder quality control process.
Please share your LPG cylinder dimensions and weight, applicable testing standard, required test conditions, target inspection capacity, workshop layout and feeding requirements. We can review your specifications and discuss suitable equipment configurations, testing arrangements and quotation details.
Contact us today to request a quotation for your LPG Cylinder Water Immersion Air Tightness Testing Machine.